Allee cinema wall redevelopment case study
The site of the project was a 100 m long, 15 m high corridor wall in an operating shopping centre, which had to be rebuilt to the desired unique facade design within the tightest possible timeframe.
The site of the project was a 100 m long, 15 m high corridor wall in an operating shopping centre, which had to be rebuilt to the desired unique facade design within the tightest possible timeframe.
Fill in our survey and find out if you are at a level of knowledge where you can really use the course in your work and progress in your career after completing it!
Upon successful completion, you will receive a coupon with a 10% discount, which you can redeem when you apply for the training!